598 projects across the state 584 completed 14 ongoing

Where these projects are

Across the state: 5 statewide programmes in this sector

Every Infrastructure Development project

Ilorin West

243
Rehabilitation of Taiwo Road, Unity Road and Tipper Garage 2022
Construction of Airport – Egbejila Road, Ilorin 2024
Construction of Asa-Dam Lower Road by Railway Flyover 2024
Rehabilitation of Road within Kwara State Stadium Complex and Interlocking of the Squash Court/Park Ilorin 2024

Ilorin South

105
Construction of Fly-Over Bridge at Pipeline Road Junction Tanke, Tipper Garage (Cv5) 2022
Construction of Interlock Pavement at Agba-Dam Housing Estate, Ilorin (Direct Labour) 2026
Rehabilitation from General Babatunde Idiagbon Flyover Junction-Tanke F Division Road-Budo Osho Junction. Ilorin 2025
Rehabilitation of Offa Garage Roundabout-Roemichs Junction-Pipeline-Tanke Bridge, Ilorin 2025

Ilorin East

62
Rehabilitation of Airport- Sawmill- Taiwo Road Ilorin 2023
Rehabilitation of Kwara State Specialist Hospital Road, Sobi-Lanre Gada Junction, Alagbado Area, Ilorin (Direct Labour) 2026
Construction of Interlock Access Road at Ita Adu Behind Awogbemi Hospital Street Linking Baruba Ilorin 2025
Construction of Interlock Access Road at Akolu – Olokan – Ajikobi Hospital Road, Abemi Community, Ilorin 2024

Asa

32
Construction of Osin – Laduba Road 2024
Construction of Interlock Pavement at Alangua Agbona Palace, Asa L.G.A (Direct Labour) 2025
Construction of Aboto-Oja – Alata Road Asa 2024
Construction of Dr. Sa'ad Omoiya Road, Odota, off Airport Road, Ilorin 2026

Edu

20
Rehabilitation of Iyana Shonga Road 29 km 2022
Construction of Kwara State College of Education (Technical), Lafiagi Internal Road, Edu L.G.A 2025
Construction of Ndafatifin Road, Tsaragi, Edu L.G.A 2025
Construction of Interlock Access Road from Emi Ndeji Tako Junction – LGEA Kuchita Street, Shonga Community 2024

Ilorin Metropolis

18
Rehabilitation of Lagos Road, Adewole & Sobi Junction, Harmony Estate Junction Road, Iorin 2021
Construction of Some Bridges/Culverts Network in Ilorin 2019
Construction of Reinforced Concrete Slabs and Retaining Walls within Ilorin Metropolis 2025
Rehabilitation of Maraba Junction, Ipata Market, Chapel Junction, Sanrab, Tanke, Royal Shekinah, Offa Garage and High Court Road, Ilorin 2021